Reuse 101: Page 3

Posted October 1, 1999
By

James Bean


(Page 3 of 3)

Figure 2. Long-term savings of Reuse. The cost incurred properly constructing components for reuse doesn't yield savings for overall development in comparison to traditional development methods until the results have been reused at least three times. After that, every reuse yields increasing incremental savings.


Page 3 of 3

Previous Page
1 2 3
 





0 Comments (click to add your comment)
Comment and Contribute

 


(Maximum characters: 1200). You have characters left.